Beyond the Grid Connection: Technologies Enabling Gigawatt-Scale Data Centers

Mar 04, 2027
B316

The rapid expansion of AI and hyperscale computing is creating unprecedented demand for 
electricity, while transmission constraints, substation capacity, equipment lead times, and 
interconnection processes are limiting how quickly new data centers can be energized. Meeting 
this challenge requires more than building additional generation and transmission: it requires 
new approaches to how large loads connect to, interact with, and support the electric grid. 


This panel will examine the status and deployment readiness of technologies that can 
accelerate large-load interconnection and enable co-located, on-site generation at 
hundreds-of-megawatts to gigawatt scale. Discussion will cover grid-enhancing technologies, 
flexible data-center loads, battery energy storage, advanced power electronics, power-quality 
mitigation, and integrated generation and microgrid architectures. 


Industry leaders will discuss what is commercially deployable today, what requires further 
testing, and what technical, operational, and commercial barriers remain. Particular attention will be given to practical implementation experience, utility acceptance, reliability, protection and 
controls, and the transition from pilot projects to repeatable infrastructure solutions. 


The objective is to identify actionable technology pathways that can bring data-center capacity 
online faster while maintaining grid reliability and operational resilience.

Panel Moderator
Farid Katiraei
Farid Katiraei, Electrical Systems Lead - Data Center Power Systems - Meta
Speakers
Ehsan Nasr
Ehsan Nasr, Engineering, Technology and Strategy - Apple
Afshin Majd
Afshin Majd, Director of Power Innovation - Microsoft
Krishnanjan Gubba Ravikumar
Krishnanjan Gubba Ravikumar, Engineering Director - GOOGLE