“Can Utilities Build Fast Enough? Rethinking Substation Modernization for the New Load Growth Era”

Mar 03, 2027
B214
Grid Modernization

As utilities race to connect unprecedented load growth from AI, data centers, electrification, and industrial reshoring, a new bottleneck is emerging across the industry: Substations.

Utilities are increasingly finding that the challenge is no longer just generation or transmission capacity — it is the ability to design, permit, procure, modernize and construct substations fast enough to keep pace with demand.

At the same time, utilities face mounting pressure to:

  • Accelerate interconnections
  • Manage rising infrastructure costs
  • Navigate workforce shortages
  • Overcome transformer and switchgear supply constraints
  • Maintain reliability and safety while scaling grid expansion

This panel will explore how utilities are rethinking the entire substation delivery model — moving from bespoke, labor-intensive infrastructure projects toward more standardized, digital, modular, and scalable approaches – focusing on efficiency.

Discussion topics will include:

  • Why substations are becoming the critical bottleneck to load growth
  • How utilities are reducing engineering and construction timelines
  • The rise of modular and repeatable substation design 
  • Digital engineering, automation, and AI-enabled workflows - Intelligent Substation Inistiate at National Grid
  • Strategies for overcoming transformer and equipment supply chain constraints
  • Whether utilities should treat substations more like scalable products than one-off projects

The session will feature utility leaders actively modernizing their infrastructure delivery approach, alongside innovation perspectives on automating and accelerating substation and interconnection design workflows.

Attendees will leave with practical insights into how utilities can modernize and build grid infrastructure faster, safer, and more cost-effectively in an era where speed-to-power is becoming a strategic imperative.

Why this panel?

In 2027 the real question becomes: “Can utilities physically modernize and build infrastructure fast enough to support the new economy?” And substations become the lens into that problem. In the AI era, utilities are no longer just planning infrastructure – they are being measured on their ability to deliver fast enough to support economic growth and rising demand.

Speakers
Carl Toner
Carl Toner, Digital Transformation Manager, Substations - SOUTHERN COMPANY
Rory Billing
Rory Billing, Head of Power - Transcend Infrastructure
Marit Lyngbaek
Marit Lyngbaek, Strategic Relationship Principal - National Grid
Troy Anatra
Troy Anatra, Director, Innovation - National Grid
Chairperson
Brian Walsh
Brian Walsh, Executive Consultant - Beacon LLC